Новости и статьи о производстве пластиковых труб

Banner
  • What Are the Advantages of a Two-Stage Water Ring Pelletizing Line?

    Our Two-Stage Water Ring Pelletizing Line is designed for processing compatible thermoplastic materials and converting plastic waste into reusable pellets. The two-stage extrusion system provides additional melt processing, while the water ring pelletizer cuts and cools the molten plastic. Optional feeding, filtration, degassing, and automatic control systems can be selected to suit different raw materials and production requirements.

    9 October 2026 г.
  • Plastic PE Pipe Crushing Machine Production Line: Advantages in Modern Plastic Recycling

    Plastic PE Pipe Crushing Machine Production Line is designed for crushing and recycling waste PE and HDPE pipes, production scraps, and discarded plastic pipes. The system can reduce large pipe waste into manageable pieces for further washing, drying, extrusion, or pelletizing. It helps improve material utilization, reduce waste volume, simplify storage and transportation, and support efficient plastic recycling.

    30 September 2026 г.
  • PE Pipe Production Line Shipped to Uzbekistan

    Our PE Pipe Production Line has been successfully manufactured and shipped to Uzbekistan. The complete Plastic Extrusion Line equipped with a high-quality Plastic Extruder provides an efficient and stable solution for PE pipe production, helping customers improve manufacturing efficiency and product quality.

    11 September 2026 г.
  • Big-bag Washing and Shredding Line for PP Bag Recycling

    Big-bag washing and shredding line is designed for recycling used PP big bags and woven bags. The complete system combines plastic shredder, plastic crusher, washing, dewatering, and drying equipment to produce clean recycled PP flakes. An extruder and pelletizing system can also be added to produce recycled PP pellets.

    7 September 2026 г.
  • Typical Problems When Starting a PE/PP Double Wall Corrugated Pipe Production Line and Their Solutions

    Learn about common startup problems with PE/PP double wall corrugated pipe production lines and effective solutions for extruder, vacuum, cooling, and forming equipment.

    12 August 2026 г.
  • PE Pipe Production Line Shipped to Uzbekistan: A New Step in International Plastic Extrusion Cooperation

    Our PE pipe production line has been successfully shipped to Uzbekistan. Learn about the PE pipe extruder, production process, main equipment, advantages, and applications.

    5 August 2026 г.

+86 17300126541

+86-173-0012-6541

sales@qdzlhx.com